Description
Costing for extra materials needed
Including but not limited to
– Timber Boards in Canopy
– Insulation Of Canopies
– Fabrication of Brackets (Where required)
Other items outside of the normal scope of work
OFFICE USE ONLY
$50.00 inc. GST
Costing for extra materials needed
Including but not limited to
– Timber Boards in Canopy
– Insulation Of Canopies
– Fabrication of Brackets (Where required)
Other items outside of the normal scope of work
OFFICE USE ONLY